After Xinjiang Sanxin Coal Mine Industry invested in the Coal Mine Drill produced by Shandong Cresics Equipment Manufacturing Co., Ltd., it precisely addressed the pain points of complex underground geological operations. Combined with the actual working conditions of the mining area, it achieved a triple breakthrough in efficiency, safety, and manpower optimization, presenting its core value through data and meeting the high standards of international coal mining.


Significant Efficiency Improvement: Replacing traditional manual drilling, the drilling speed per hole increased by more than three times, reducing the time from 8 minutes/4 meters per hole manually to 2 minutes/4 meters. The average daily work volume reached 200 meters, a 30% increase compared to traditional equipment. The equipment's overall utilization rate reached 85%, and the monthly tunneling progress increased from 120 meters to 160 meters, significantly shortening the mining cycle and reducing construction costs.



Enhanced Safety: Utilizing remote control with human-machine separation, operators are kept away from hazardous drill pipe areas, eliminating safety hazards such as drill pipe breakage and drill bit escape, reducing the underground accident rate by 100%. Equipped with explosion-proof devices and gas power-off devices, gas drainage efficiency is improved by 25%, effectively reducing the risk of gas exceeding limits, and the equipment's operational safety rate reaches over 99%.


Significantly Reduced Labor Intensity: The number of operators per shift has been reduced from 26 to less than 5, a 77% reduction in manpower. Automated processes such as drill pipe unloading and drilling eliminate the need for operators to perform close-range heavy-duty work, reducing labor intensity by 80%, while also reducing dust pollution, improving the underground working environment, and lowering occupational health risks.


High Equipment Adaptability: Suitable for narrow roadways and complex rock formations in Xinjiang mining areas, maintenance costs are reduced by 20%, and single-fault repair time is shortened from 8 hours to 3 hours. Balancing efficiency, safety, and economy, it provides a replicable, high-efficiency mining solution for international coal mining companies.